Skip to content

Asset Management

Welcome to the Innovyze Asset Management feedback page.

This forum is now locked as we transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

4 results found

  1. InfoAsset Planner - View Multiple CCTV Videos Concurrently in Facility Assessment Tool

    I have had a request from the Asset Condition and Reliability team to be able to view CCTV survey videos side-by-side when a pipe has multiple CCTV surveys. In the same way that the longsection view shows concurrent surveys, being able to see concurrent CCTV survey videos would be very beneficial to visually assesses changes in asset condition over time.

    Current;y, switching between CCTV videos is very time consuming when comparing multiple surveys as only one can be viewed. Being able to view CCTV videos side-by-side-by-side would make the Facility Assessment Tool much more effective.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Condition  ·  Admin →
  2. Capability to View Manhole Panoramic Scans

    Many of our client's manholes were surveyed with panoramic scans, so there are no still images that we can link to within InfoAsset Planner to view the inspection. We would like to ability to view manhole panoramic scans. The file format of these scans consist of "Storm and Sanitary Analysis Data Files," an IPF file, an IPS file, and subfolders of many still images from the pano scan.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Condition  ·  Admin →
  3. Info Asset Mobile Field

    When conducting a CCTV survey in Info Asset Field our crews add the related xml, video footage and photos which provide the results of the survey.

    In the capture form there is no option to add multiple files at once. Our CCTV crews are having to add one file at a time and having to navigate folders in order to find the required document as there is no 'drag and drop' option either.

    Crews can survey 32 to 50 lengths per survey in some instances which makes adding multiple files very time consuming, adding to the operational team admin time…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Asset Condition  ·  Admin →
  4. Info Asset Mobile Field

    When our CCTV crews are using Info Asset Mobile Field for a CCTV survey capture, they are often surveying multiple lengths (recent example 32 runs).

    The teams are presented with a data capture form per length and each form has to be completed and closed for the survey data to be passed back to Info Asset Manager.

    This is very time consuming and adding a considerable amount of additional admin time into each survey.

    Please can you review the CCTV capture form and find a way that the entire job can be captured in one form that could relate to…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Asset Condition  ·  Admin →

Feedback and Knowledge Base