Water Distribution
41 results found
-
Can you include scenarios in WS Pro environment similar to ICM
ICM has the capability of the scenario modelling within the single network. H2Omap also had the same capability. Any possibility of having the same capability in WS pro?
29 votesThis feature is now released in version 2021.8 available for download.
Here’s a walkthrough video:
https://www.youtube.com/watch?v=Twdqs_uKHK0&ab_channel=InnovyzeThank you for the votes!
-
As a user, I would like an automated method to allocate demands from meter points through lateral polyline to pipelines.
I need a way to allocate demand from a meter (point meter) to the pipe (polyline) based on the lateral connection (polyline) at end points.
Keep in mind:
The features might not snap nor connect to pipes20 votesThis feature has been completed and is included in InfoWater Pro 4.0 Update 1 being released today.
-
Automatically Generate System Curves in Infoworks WS Pro
In InfoWorks WS Pro - A way to automatically generate a system curve for a pump would be extremely useful.
17 votes -
in IWPro to have a symbol for easy indication of UPC attached to an asset
It can be difficult to tell if UPC is attached to a pump without checking every time. It would be very helpful to have a way to show UPC, such as similar to live data.
16 votesThis will be provided with WS Pro 2021.5 (target release date April 2021)
-
Make InfoWater windows and dialog boxes resizable
Many windows in InfoWater/InfoWater Pro are not resizable, making it difficult to see long values.
9 votes -
Import demand scaling using CSV file on WS PRO
Please add the ability to import demand scaling using CSV file on WS PRO
9 votesThis feature was implemented in InfoWorks WS Pro 2021.9.
Demand scaling can be exported and imported using CSV files.
-
display multiple scenario results on long section picks
For long section picks on model runs showing the hydraulic gradients etc. it would be useful when carrying out scenario work to be able to display more than one set of run results - currently have to export to excel.
9 votes -
use of custom buttons over multiple models
At this time the custom action buttons are only relevant to the database. As a user who has a number of SQL toolboxes which I use across multiple models it would be highly beneficial if these custom action buttons could be set up in the software so they were applicable to all models opened
8 votesSQL can now be exported to IWQ files (binary formats). Those can then be stored in the factory SQL library directory and then used across multiple master databases. Functionality available from WS Pro 2021.5, target release date April 2021.
-
Multi-species water quality
As a user I want to be able to handle multi-solute water quality defining my own set of equations (same as EPANET MSX)
8 votes -
Add Max/Min HL/1000 Results
Can't currently map Max HL/1000. This would be more efficient/useful in some cases than mapping Max HL (feet). If your model has many segments, it is possible that very high head loss areas will not be flagged if only the HL is available.
7 votesThanks for the idea! This is now in InfoWater Pro version 3.5 Update 3 and up.
-
Default 'Start Time' for testing feed Time Range in Live Data Feed
Currently in Test Feed window of Live Data Feed both 'Start Time' and 'End Time' default to now. It would be better if the 'Start Time' as in the past (e.g. today minus one day). That way when connect to live data from Pi or Scada some output would be produced. At the moment with the current defaults the user always have to modify the 'Start Time'.
7 votes -
Allow Ctrl+C and Ctrl+V in InfoWater Pro
I could always copy and paste attributes via simple keyboard commands (Ctrl+C and Ctrl+V) in classic InfoWater, but can no longer do that in InfoWater Pro. You can right click and select "Copy" or "Paste", but that takes longer. Bring back keyboard commands.
7 votes -
As a user I would like to use Equivalent Persons (EP) for demand allocation.
As a user and working within a Queensland council, Equivalent Persons (EP) are used for Local Government Infrastructure Plan (LGIP) triggers and growth planning. As the Census data is used create a demand model to define development staging horizon demands.
Currently, WSPro can handle no. of properties (l/service/day) which uses an integer but can’t handle Equivalent Persons (EP) that needs decimal formatting.
Our council believes a work-around is not suitable and creates complexity to demand allocation. WSPro should be able to handle different mechanisms for demand allocation to support all councils in Queensland and across Australia.7 votesThis was completed in version 2021.10. Equivalent Persons is a new demand Category Type.
-
Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction
Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger negative value shows as the minimum flow. This is wrong.
6 votesInfoWater Pro reports Max/Min flow using the absolute value.
InfoWorks WS Pro reports velocity according to maximum magnitude (+ or -) for understanding shear stress but flow maintains the sign since that has some applications.
While WS Pro can Theme the pipes with absolute value of flow, you can use an SQL to generate a table. For example:
SELECT IIF,sim.qmax,ABS) AS [Max Q] -
Combine simple and rule-based controls dialogs
It is currently difficult to identify if a facility has a rule-based control. An improvement would be to access all the controls for a facility through the existing controls button. Clicking the controls button would open a single window with a tab for simple controls and a tab for logical controls.
6 votesNew Control Overview functionality provided with InfoWater Pro 3.5 Update 2. Target release date April 2021.
-
Have an indicator of the date/time of last successful model run
Add a date/time stamp for the last successful model run somewhere in the run manager window would be helpful. Once a run has been completed, it is possible for a user to make changes to the model which would affect the hydraulics, yet the stoplight still shows green/yellow. It's possible for a user to THINK they have completed a run with the latest changes despite their not being incorporated.
6 votes -
clearer ArcGIS version info
Would be good to see clearer version info on innovyze.force.com...
The old site innovyze.com/updates was better viz "for ArcGIS 10.3-10.7"6 votesDownload pages have been updated for clarity.
-
Allow decimals in number of properties assigned to customer points
When setting up future demand scenarios we are often provided increase in population over an existing area of the network, reflecting infill growth across the area. However we can't distribute this across existing customer points because only a whole number of properties can be assigned to each customer point.
Demand scaling could be used for this but has a number of drawbacks:
- To use demand scaling we need to change the area code to reflect development areas, which means we can't use area codes to analyse DMAs.
- It also means the demand statistics for a network does not…5 votesThis was implemented as "Equivalent Persons" as a new demand "Category Type". It operats the same as Properties but supports non-integer values.
-
Add zoom to and map navigation ability in the report tables for InfoWater Pro
I use both Bentley and Innovyze water modeling software and i have noticed that the Bentley software allows you to zoom to elements from the report tables and allows you to pan, click, review properties, etc. while the report table is open. It would be really nice if Innovyze could include a zoom to feature in the report tables (similar to what is already included in the DB editor), and allow the user to pan around in the map and click on elements while the report table is open.
5 votes -
Improve Table Joins and Symbology
Having the option to join all layer tables is great, but it's painfully slow. Other software that are add-ins to ArcGIS Pro do more or less the same thing, but update/run in a fraction of the time. Could the table join or database format be improved so it does not take so much time to refresh?
Also, instead of having to join all layer tables to utilize ArcGIS Pro's built-in symbology OR only use InfoWater Pros Map Display could they be used universally or in tandem? It would be nice to seamlessly use both symbology tools and have them display…
4 votes