  1. in IWPro to have a symbol for easy indication of UPC attached to an asset

    It can be difficult to tell if UPC is attached to a pump without checking every time. It would be very helpful to have a way to show UPC, such as similar to live data.

    16 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  Luca Serena responded

    This will be provided with WS Pro 2021.5 (target release date April 2021)

  2. elevation

    When inserting a new junction in an existing pipe, InfoWater Pro interpolates the elevation data between the two existing nodes to come up with a default elevation estimate. A useful setting option would prevent this from happening, and instead default to a 0.00 elevation.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. display multiple scenario results on long section picks

    For long section picks on model runs showing the hydraulic gradients etc. it would be useful when carrying out scenario work to be able to display more than one set of run results - currently have to export to excel.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. Automatically Generate System Curves in Infoworks WS Pro

    In InfoWorks WS Pro - A way to automatically generate a system curve for a pump would be extremely useful.

    17 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Run MSX in IWLive

    There is massive interest in having a water quality model that shows pH, Nitrification, chlorine levels, age, and tracing in real time. Currently this is only possible for water age (the basic EPANET WQ does not allow for the source tracing and quality modeling we need).

    Would be really nice to do these with IWLive with shorter duration Server runs (using the proceeding projection), as opposed to having to do 20 day runs in IWLive, export to InfoWater, then setup MSX there and run for another 20 days.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. As a user I would like to use Equivalent Persons (EP) for demand allocation.

    As a user and working within a Queensland council, Equivalent Persons (EP) are used for Local Government Infrastructure Plan (LGIP) triggers and growth planning. As the Census data is used create a demand model to define development staging horizon demands.
    Currently, WSPro can handle no. of properties (l/service/day) which uses an integer but can’t handle Equivalent Persons (EP) that needs decimal formatting.
    Our council believes a work-around is not suitable and creates complexity to demand allocation. WSPro should be able to handle different mechanisms for demand allocation to support all councils in Queensland and across Australia.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Trace an isolation to a 2-valve shut down

    Denver Water has a massive outage program that runs a minimum of 6 months per year. All outages are modeled. For nearly all outages, 2 valves are shut down for safety. Having the isolation trace in IWLive contain an option to trace to the 2nd valve would be really useful and make this process significantly easier!

    2 votes