Add a button or function key to re-run the last model run
This would speed up the process of model calibration, where I would be adjusting a pipe roughness, PRV or PS control and run the model after each adjustment. Instead of opening the run schedule and clicking run and then ok, a run button or function key would speed this up.
1 voteright-click on the run and re-run → the software is going to ask you if you want to use the latest network/control.
-
As a user, I would like an automated method to allocate demands from meter points through lateral polyline to pipelines.
I need a way to allocate demand from a meter (point meter) to the pipe (polyline) based on the lateral connection (polyline) at end points.
Keep in mind:
The features might not snap nor connect to pipes20 votesThis feature has been completed and is included in InfoWater Pro 4.0 Update 1 being released today.
-
Hi Innovyze, I would like to request in the InfoWater Designer add-on group limits(only currently set to 100) similar to InfoSWMM limit .
The current InfoWater add-on Designer has limit of 100 groups that can be assigned to the model pipes, pumps and tanks.
I have recently found from a colleague that the InfoSWMM add-on Designer has unlimited groups for pipe and other variables.
I do hope Innovyze can assist to have this capacity for InfoWater improved similar to InfoSWMM.
Kind regards
Romer
2 votesExtended to 300 pipe groups on InfoWater 10.4 Update 9