Skip to content

Water Distribution

This form is now locked to allow us to transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

13 results found

  1. Improve Table Joins and Symbology

    Having the option to join all layer tables is great, but it's painfully slow. Other software that are add-ins to ArcGIS Pro do more or less the same thing, but update/run in a fraction of the time. Could the table join or database format be improved so it does not take so much time to refresh?

    Also, instead of having to join all layer tables to utilize ArcGIS Pro's built-in symbology OR only use InfoWater Pros Map Display could they be used universally or in tandem? It would be nice to seamlessly use both symbology tools and have them display…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  0 comments  ·  Productivity  ·  Admin →
  2. Make InfoWater windows and dialog boxes resizable

    Many windows in InfoWater/InfoWater Pro are not resizable, making it difficult to see long values.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  3 comments  ·  Productivity  ·  Admin →
  3. Add Max/Min HL/1000 Results

    Can't currently map Max HL/1000. This would be more efficient/useful in some cases than mapping Max HL (feet). If your model has many segments, it is possible that very high head loss areas will not be flagged if only the HL is available.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Admin →
  4. Initial Status Setting Saved to Model Preferences

    Currently the "Show Pipe, Pump and Valve Initial Status" under the Display Settings tab in the model Preferences window will not stay checked after you save, close, and reopen the model. Please have this option/setting maintain the last setting when the model is reopened.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Link to Examples

    Do you have an expounded example of each InfoWater Allocation Method with examples? It will help if a link is established to get directed to that documentation. For example; can you help me get directed to an example Closest Junction allocation method?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. Import demand scaling using CSV file on WS PRO

    Please add the ability to import demand scaling using CSV file on WS PRO

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Can you include scenarios in WS Pro environment similar to ICM

    ICM has the capability of the scenario modelling within the single network. H2Omap also had the same capability. Any possibility of having the same capability in WS pro?

    29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. Add zoom to and map navigation ability in the report tables for InfoWater Pro

    I use both Bentley and Innovyze water modeling software and i have noticed that the Bentley software allows you to zoom to elements from the report tables and allows you to pan, click, review properties, etc. while the report table is open. It would be really nice if Innovyze could include a zoom to feature in the report tables (similar to what is already included in the DB editor), and allow the user to pan around in the map and click on elements while the report table is open.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  2 comments  ·  Productivity  ·  Admin →
  9. Allow Ctrl+C and Ctrl+V in InfoWater Pro

    I could always copy and paste attributes via simple keyboard commands (Ctrl+C and Ctrl+V) in classic InfoWater, but can no longer do that in InfoWater Pro. You can right click and select "Copy" or "Paste", but that takes longer. Bring back keyboard commands.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  0 comments  ·  Productivity  ·  Admin →
  10. Combine simple and rule-based controls dialogs

    It is currently difficult to identify if a facility has a rule-based control. An improvement would be to access all the controls for a facility through the existing controls button. Clicking the controls button would open a single window with a tab for simple controls and a tab for logical controls.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  Luca Serena responded

    New Control Overview functionality provided with InfoWater Pro 3.5 Update 2. Target release date April 2021.

  11. Enhance the performance of domains in InfoWater Pro

    There is no reason an ArcGIS selection should work 5-50x faster than using domain tools in InfoWater. ArcGIS made great enhancements to ArcGIS Pro and utilizing a 64-bit environment. InfoWater could be much improved from a performance perspective

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  Luca Serena responded

    This is an issue that laisse inside ArcGIS Pro where moving the information of large maps and layers between threads may take some time. This has negatively impacted the InfoWater Pro performance, where simple tasks like enlarging domains or switching scenarios could take up to several minutes where the same task would have been performed in a matter of seconds on regular InfoWater. The Development Team identified a workaround to the issue with the introduction of the “Conditioned Table-Join” in InfoWater Pro 3.0.

    Testing has proven significant performance which also scales up nicely for the large networks and it does not affect performance when dealing will smaller systems. Nothing changes for the end-user but performance increases ranges between 60 to 80% depending on model size.

  12. I would like to symbolize fire flow results using the Map Display feature.

    It would be really helpful to visualize fire flow results such as Hydrant Available Flow in formats such as contours or changing the symbology of junctions. This provides a quick visual of the system and deficient areas or where boundary conditions may be interfering with results.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  1 comment  ·  Productivity  ·  Admin →
  13. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  1 comment  ·  Productivity  ·  Admin →

Feedback and Knowledge Base