Sub catchment Ground Slope
Currently ICM isn't equipped with the tools to calculate the slope from an underlying ground model or 2D zone so this will need to be determined outside of the program. Can you include the ability for the program to calculate an average catchment slope based on the 2D mesh data or ground model within each sub catchment as an option if this has not been done outside of ICM?
12
votes
Bill Johnson
shared this idea