  1. Sim Slots

    There should be an option to select to limit sim slots to be used by a model so other models dont go in waiting when running sims simulataneously .

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Admin →
    IN DISCUSSION  ·  pascal.lang responded

    Hello there,

    If my understanding of the request is correct then I believe that this capability does already exist in the agent options. If you are able to start the InfoWorks ICM agent manager, then here it is possible to set a maximum number of concurrent simulations which can be active at any one time.

    Thanks,
    Pascal

  2. Have multiple Workgroup Data Servers

    I want to be able to segregate databases between different parts of the business so they only have visibility of, and access those specific to them. Having the ability to install multiple WDS on a single server makes sense from a cost/configuration/data segregation perspective but currently this isn't possible.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Other  ·  Admin →
  3. Set database management permissions

    (Workgroup) database permissions are now mainly used to prevent users from modifying content within the database, but there is currently no way to prevent them from updating databases, creating new ones unlimitedly on servers with otherwise protected access etc. It would therefore be useful to have an additional security level which deals with database management permissions.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Other  ·  Admin →
    IN DISCUSSION  ·  pascal.lang responded

    Thank you for this request.

    There are already settings available for database creation permissions which can be implemented using the snumbat.ini file.

    Specifically there is a keyword “AllowDatabaseCreation” where a setting of 0 means creation is disallowed and a settings of 1 means creation is allowed. The Workgroup Data Server Administration document which can be requested from Innovyze talks through these steps and provides examples for the snumbat.ini files.

    When it comes to the updating of databases, is this to restrict the ability to update from a particular software version database to a later one or rather to prevent update to the contents of the database please?

    Thanks,
    Pascal

  4. On behave of Chinese users, could developing team transfer drainage design module from infoSwmm into ICM?

    On behave of Chinese users, could developing team transfer drainage design module from infoSwmm into ICM?

    Clients in China do have this wish to do drainage and model in same software. Many of our potential client choose Hongye (a simple drainage modelling software) instead of ICM only because Hongye could do pipe design work.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Admin →
    IN DISCUSSION  ·  pascal.lang responded

    Thanks for raising this request on User Voice. For the drainage design requirements across the globe at a localised scale we have InfoDrainage, when looking to take a design which has been produced and to then understand the more holistic catchment wide impact of such a design, this is where the model can be imported into InfoWorks ICM for integration. It is probably worth exploring this in more detail in this instance to understand exactly what the end goal the client is after and at what scale the work is being completed if that would be possible.

  5. Checking

    Can we have a feature to monitor who has Network Soft Licences. Earlier we had the Admin Control center to check.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Other  ·  Admin →

Feedback and Knowledge Base