Manhole Schedule Numbering
For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30.
I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deepest, e.g. U/S to D/S. As is quite common in design additional MHs need to be incorporated further into the model due to clashes or change in direction etc, so it would be best if all outputs and MH tables followed the numerical order.
9
votes
Ryan Herity
shared this idea
-
Ryan Herity commented
Manhole Scheduling Numbering