Drainage Design
9 results found
-
PDF output Data sheets - Same as MicroDrainage
Have a setting when printing results to output in the same or similar style as MicroDrainage. Options to display certain storms, critical storm by differing criteria, and summaries of pipelines, manholes and other data
6 votesThank you for the suggestion. This is to confirm that we've received your idea and it will be reviewed by the product management and development team for future consideration.
-
InfoDrainage 2023.3 Quick Storage Estimate Print Outs
Please can a function to print out the quick storage estimates and results summary be made available. Whilst they should only be used for concept designs, it would be useful to have this information for record to show the design process
1 voteThank you for the suggestion and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.
-
Formatting of Reports
The output reports from Infordrainage, are not set to fit the page and as such, there is a lot of "white space" left on the outputs. At present, there are no formatting options to change this. It makes the drainage report look a bit untidy.
5 votes -
Manhole Schedule Numbering
For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30.
I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deepest, e.g. U/S to D/S. As is quite common in design additional MHs need to be incorporated further into the model due to clashes or change in direction etc, so it would be best if all outputs and MH tables followed the numerical order.9 votes -
Provide Enhanced Manhole Schedule Details
It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules.
As an example including practical details around the cover – contractors want to know and see more from a MH schedule when out on site.
Examples of details around the type of cover:
Cover Size
Opening Size
Recessed
Solid Top
Loading ClassCurrently this level of additional detail is often added manually to MH schedules exported from software.
8 votes -
Assess scenarios based on annual water balance (runoff, infiltration, evaporation)
Assessment of the annual water balance is an important criteria to evaluate drainage design at neighbourhood level.
Functionality to assess scenarios in a chart (similar to typical pre-urban vs. urban) would save time in GIS-postprocessing2 votes -
"Copy to clipboard" alongside print/export on Microdrainage spreadhseet input/outputs
Would greatly simplify the process of getting results/details from MD into a report, skipping a stage in the current process (Export to CSV/Excel - Open)
2 votes -
Support Biodiversity net gain
Support the ability to create a biodiversity metric for SuDS structures as per the Defra tool.
3 votes -
Print Tickbox for Manhole Schedule Layout option
In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
2 votes