Storm Sewer & Flood Modeling
Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.
24 results found
-
As a user, I would like to have warnings about the landuse polygon size that will greatly slow down the performance in XPSWMM.
Large number of land use polygons can greatly slow down the performance of XPSWMM, it can take up to 10 min to open and save a model. Ideally this issue should be fixed. Before that happens, if XPSWMM can warn the user for the large size of the landuse polygons, and provide links to ways to simplify the polygons or move landuse out as a reference layer, that will save the users lots of time.
1 vote -
Create preset 2D inflow equation
Similar to inlet capacity, have the ability to create 2D inflow equations relative to inlet size and control depending on weir or orifice curves. This will allow the user to increase or change 2D inflow control easier and more standardized.
2 votes -
Loading bars for large 2d TIN results.
Vissible loading progress for loading large or TIN modelling results.
2 votes -
Enable TIN Reference in Scenarios (Enable/Disable)
All other layers in XPSTORM/XPSWMM are able to be deactivated for different scenarios.
If you could allow for the Topography tins to be activated and deactivated (like Fill Areas, Elevation Shapes etc), this will allow for multiple scenarios (i.e. pre- and post-development) and minimise the complexities of trying to model two identical scenarios on two seperate models.
1 vote