Storm Sewer & Flood Modeling
Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.
4 results found
-
Re-order objects
Can it be possible to re-order objects within an InfoWorks ICM model Group. As objects can get added or superseded over time. So to aid model audits and ease of use, it would be really beneficial to have an option to re-order. Thanks
6 votesThanks for the idea. Have you tried using the different sort options in the tree?
-
Remove Need to Validate When Changing Background Layers
Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when I don’t recall changing anything.
26 votes -
Show data errors
Mike + added a function called "show data errors" in its new product in 2021, which can display objects that lack necessary field information and generate a table. This function can improve the ability of model engineers to deal with model errors more quickly. I hope ICM can add this function
2 votes -
Speed up interfaces with 2D zones with millions of elements (make it a multicore process)
The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete different videocards (Quadro K2000 vs Quadro M6000 24GB) but that did not make any difference (both slow). The interface/geoplan works fine when we do not display the 2D zone. We tried lot of things that were suggested by your supportdesk, but it seems like that this is something that will only really improve…
7 votesGathering some example models for the development team to consider.