Results format
Why does InfoDrainage deafult to showing you the Stormwater Controls summary, and only the Stormwater Controls summary, when a model finishes running?
This occurs even if the Stormwater Controls are fine but the Junctions are showing flooding.
I mean, I know you can manually check all the other results summaries, but why doesn't InfoDrainage either open them all or choose the most critical one?
Thank you for the suggestion and thanks to those who commented and voted. This is to confirm that we've received and reviewed your suggestion and here is our response:
We believe that stormwater controls are the most critical element of the drainage design. Hence we show the results of SWCs as soon as the simulation is finalised.
Users can/should check the rest of the model to ensure that there aren't any bottlenecks in the system.
It might be feasible to implement a dropdown menu within the SWC results so we can still show results from SWCs, but we make it easier for users to jump to different screens and check the inflows, connections and junctions.
Would the above address what is required for this case?