As a user I need to represent and optimise for throttled discharge from subcatchments to node or conduit objects
Many cities are limiting maximum stormwater dicharge to drainage networks.
ICM should include more efficient modelling regarding
- Limiting stormwater flows from subcatchments via throttle requirement (e.g. 0-10 l/s*ha subcatchment), suggesting a new subcatchment data field.
- And quickly analyse how much stormwater (e.g. 10 m³ ) needs to be managed/retained on each subscatchment site via SUDS such as greenroofs, swales, etc. in order to meet and optimise throttle requirements.

This feature was included it in the 2023.1 update. Check out the What's New for more details. If you have already used it, we would love to hear your feedback on how it is working for you. Thanks again for the great suggestion!