  1. Clash detection between pipe networks

    Can wall thicknesses be added to pipes and manholes to check clash detections

    17 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Dear User, 


    Thanks for posting, commenting and voting for this idea. We have reviewed the requirements for implementing a clash detection tool in InfoDrainage, and this is currently in Development for future releases of the software.


    As for the comments regarding the pipe thickness, we will enable customers to insert a tolerance value so users can account for both the pipe trench width/height and the pipe thickness when deciding the vertical and horizontal tolerance values.


    Kind Regards, 

    InfoDrainage Product Management team

  2. Sewer Design - Depth to soffit

    InfoDrainage currently has the depths shown as depth to invert when depth to soffit is more useful to ensure the sewer has sufficient cover

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. InfoDrainage - Permeable Paving

    It would be useful to have a central granular conveyance trench beneath permeable paving to avoid the need for overly deep sub base beneath the road / drive.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. Exceedance Level in Infodrainage

    It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level
    By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for our designs to have circa. 1m+ cover from top of tanks/soakaways etc to ground level.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Tree Pits

    Add Tree Pits as a type of SuDS structure.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. Velocity and proportional velocity to be shown on Tables

    When designing sewers a critical design criteria is the pipe velocity when full or at design discharge rate. It makes designing sewers quite iterative without this included

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Thank you for the suggestion and thanks to those who commented and voted. 


    In order to get rid of the dendritic numbering system that was in MicroDrainage which prevented users from modelling bifurcation, we had to introduce the design wizard rather than an optimise button that looked at the whole system. This means that users will have to run a design wizard to check the velocities. However, we've introduced various flexibilities for turning on and off design criteria parameters which will make these iterations easier.


    Does the above address your suggestion?

  7. Improved tutorial for setting up a network

    InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullies.

    when asked "was this page helpful" i put thumbs down, hoping to get a chance to say the above but i cannot type in the feedback form. please update chapter 2 "creating the network" so that new users can setup a simple network - all ive done is click buttons to load random data and do not feel like i…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. InfoDrainage - level bench in basin/pond configuration

    The sizing calculator in the pond build pop-up enables one side lpe only.
    There are now LLFAs that require level benck of at aleast 1.5 m width after 0.6 m depth in a basin.
    It is currently not possible to use your calculator to establish such basin properties.
    This would be useful.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. Infodrainage - Display Settings - Annotation Connections Slope

    Infodrainage - Display Settings

    Slope annotation in connections to be 1:x rather than shown as x(1:x)

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  10. InfoDrainage - Time of entry to be called time of entry, not time of concentration

    Te has specific meaning in the UK when using the rational method (modified).
    Tc also has speific meaning (Te + sumTf).
    It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of concentration, which is very confusing.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. Need Papadaskis-Kazen Time of Concentration for Preliminary Sizing

    The local requirement for Arizona require the use of Papdaskis-Kazen as the time of concentration method. Please add.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  12. Fall column

    Include a column in the connection design table that displays an editable 'fall' value, i.e. calculated value of US/IL - DS/IL, used to be a handy feature in MicroDrainage Network

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  13. 3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Thank you for the suggestion, and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.

    We are working on enhancing the long section, so it shows more data in the tables, and we made it flexible so users can select what to view. We are also working on annotating the Hydraulic Grade Line and the Energy Grade Line. This is now on our road map for future releases of InfoDrainage.

  14. Include Linear Drainage Channels

    Support a wider range of linear drainage channels.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  15. SuDS and Inlet Level sync stepdowns

    Infodrainage 2023.2
    Inlets into SuDS features need to be able to be different from the SuDS features bed level.
    It is almost always necessary to have a step down between inlets and outlets on Ponds and Swales etc.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Thank you for the suggestion and thanks to those who commented and voted. 


    The inlet pipe will always try to sync to the bed level of your Storm Water Control (SWC), however, you can easily lock the pipe and manipulate the level so your inlet pipe can be higher and your outlet pipe can be lower. You can introduce inlet and outlet chambers and you will have full flexibility in dropping the levels as required.


    Does the above address the issue?

  16. Realistic ground profile for swales

    This is a flaw that's been going since MicroDrainage, but when you change the type of a connection from a pipe to an open channel, like a swale, there's no information at all provided about the actual size of that feature.

    I had one come in the other day, only attenuation on the whole site was in a swale. Parameters for the swale has been set 0.5m base width, 1:3 side slopes, Mannings n 0.03, everything normal and okay with this, right?

    But the manholes at the top and bottom of the link that had been turned into the swale…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Thank you for the suggestion and thanks to those who commented and voted. 


    If you try to build your swales using the SWCs rather than converting links to swales, you will see that you can start from the top area and go down (1:3) or you can start from the bottom and go up (1:3).


    Does the above address your suggestion? I'd be interested to hear your thoughts once you try it.

  17. Output Cv values

    Cv values used to be set globally and would be output as part of the simulation criteria, so the values that were used were always visible in results files for LPA/LLFA officers to check that the model complied if a 0.9 or 0.95 Cv was requested as many authorities now do.

    Now the Cv values are per catchment, so if I need to change them to suit an authority's requirements I have to do it manually on many items, and it's hard to output them to prove to the authority that I have followed their requirements.

    It would be great…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    The report that is automatically generated by InfoDrainage has this detail when you tick Inflows (see screenshot attached). InfoDrainage will report on every subcatchment and detail what CV values have been used for summer and winter.


    Does the above address your suggestion?

  18. Mixed decimal place

    I'm using InforDrainage 2023.1 and there are mixed numbers after decimal point. In profile view, there are five digit after decimal point which is unnecessary.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  19. manhole and pipe size files

    when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  20. to be able to change the default button in storm duration

    to be able to change the default button in storm duration so I can set up my own default settings

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

← Previous 1

Feedback and Knowledge Base