Water Distribution
31 results found
-
Be able to change the background colour
In InfoWorks the background colour for the GeoPlan is white - it would be beneficial to change this colour to the users choice to make particular features stand-out more clearly in the GeoPlan view
5 votes -
Add new run groups and move existing runs to these
I’ve currently got one very big run group which should’ve really been split into several different ones.
Is there a way to move around runs? In the explorer there’s only really the option to duplicate.4 votes -
Boundary trace toolbar shortcut
I often use the boundary trace tool to understand the extent of a DMA/PMA. Currently, we have to go to Geoplan -> Tracing Tools -> Boundary Trace, and it would be a lot easier if it was available as a toolbar shortcut.
3 votes -
Node Name Generation Default
In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network
5 votesThe functionality is already provided with the Digitisation Template in WS Pro. Please confirm what enhancement are you suggesting. Thanks
-
Improvements to custom DB table fields
- Ability to modify the length of custom fields in the DB tables after they have been created. This is particularly a problem when you create a text field, but realize later it is too short. Another option would be to make the default text length 250 characters rather than 20.
- Better manager for custom fields. The user should be able to create a field once and choose which information DB tables to add it to. See example at link. https://ibb.co/CbFKnn2
5 votes -
Specify number of demands
I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
2 votes -
2 votes
-
Split pipes using the InfoWater "Digitize Network" tool
The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split when it actually has not.
1 vote -
Add ability to rename datasets, patterns, queries, etc
- Allow the "Change ID" tool to rename datasets, patterns, queries, etc.
- Make the "Change ID" window wider or resizeable to fit longer IDs.
10 votesPartially completed: “Change ID” window is now resizable. Functionality available from InfoWater Pro 3.5 Update 2. Target release data April 2021
-
As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.
Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (27,000 lots) in Melbourne.
The study explored the capabilities of the software to model the urban water cycle. It has identified some significant advantages to an integrated modelling approach, however there are some key limitations of the software and hardware which limit its future use.
We have published a joint paper that discussed the need and the concept and that can be make available upon…
7 votes -
Multi-thread simulations
As a user I want to take advantage of multi-threaded CPUs to accelerate simulation intensive procedures (e.g. design calibration)
23 votes