Skip to content

Asset Management

Welcome to the Innovyze Asset Management feedback page.

This forum is now locked as we transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

66 results found

  1. Incorporate Scenario Manager and Data Sets

    IAP is very good at calculating the risk profile under existing conditions, and recommending rehabilitation actions. It would very powerful to combine these tools with the scenario manager and data set functionality that exists in the Innovyze hydraulic modeling platforms. Ideally I would like to build future scenarios that take the output from current rehab recommendations, assume they are completed, and create a new data set with pipes/assets showing the new (future) installation date and new material as applicable. I would then be able to run scenarios into the future to see how long it would take under a defined…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  2. InfoAsset Planner - View Multiple CCTV Videos Concurrently in Facility Assessment Tool

    I have had a request from the Asset Condition and Reliability team to be able to view CCTV survey videos side-by-side when a pipe has multiple CCTV surveys. In the same way that the longsection view shows concurrent surveys, being able to see concurrent CCTV survey videos would be very beneficial to visually assesses changes in asset condition over time.

    Current;y, switching between CCTV videos is very time consuming when comparing multiple surveys as only one can be viewed. Being able to view CCTV videos side-by-side-by-side would make the Facility Assessment Tool much more effective.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Condition  ·  Admin →
  3. Display background networks in 3D view of IAM and ICM

    While considering design work, we want to see in 3D how new pipe layouts might conflict with the alternate systems (water supply, sewer, storm, etc.).
    On the map we can overlay colleciton networks, distribution networks, etc., but they don't show up in 3D. This would help us assess spatial conflicts.
    (This request came from our Water Talk)

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. as a distributor, i would like to have the complete function of risk in planner into manager.

    planner is much more complete process and easy to help the client to get the final work plan, while manager is more about managing the data and much powerful to managing the data. adding the funciton of planner, will make manager much more attrative and practial to use and easy to sell.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. As a user, I would like the CCTV survey import tool to identify when the Pipe Segment Reference/Pipe ID is inaccurate.

    Currently, when importing CCTV inspection data, InfoAsset Planner looks for the inspection based upon Upstream and Downstream assets. If it finds a match, it does not check if the pipe segment reference/facility ID match as well. It only checks the pipe segment reference if a match is not found via US/DS IDs.

    Ideally, I would like the import tool to identify any case when the pipe segment reference does not match the GIS (in addition to identifying if the US/DS do not match). This would be beneficial because it helps ensure the quality of CCTV and GIS data. Survey and…

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. Export to extended TAB format

    Can extended Tab format be added so software compatible with x64 MapInfo and allowing export of Tab files greater than 2Gb

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Automated exchange with CMMS System

    I want to use InfoAsset Planner on a (near) daily basis for optimizing O&M. The API connection to CMMS systems like Lucity and Cityworks is good but it still requires manually importing the data and manually creating work orders to send out.

    2 ways to improve this workflow:
    Automate the import of data from CMMS system
    Streamline the process to generate work orders from rehab plan

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Work Order  ·  Admin →
  8. As a user, I want to log CCTV import results and geocoding results

    In Infomaster, after importing CCTV inspections, it will popup a log text file and same as geocoding in CCTV wizard. But the log files are not available in InfoAsset Planner. Development team, please bring them over to Planner. Thanks!

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Admin →
  9. InfoAsset Planner - Data Miner Automation

    Data Miner Automation.

    As a user, I'd like to be able to call on and run other tools from the Data Miner. (i.e run pre-set analysis from the Analysis Tab - LoF, CoF, Risk, Rehab Plan, etc)

    This will allow me to create more complex analysis workflow. This way, I can be sure that prior analysis that I use as input later down the workflow are refreshed. This will also let me do everything from one spot without toggling between the tools and running them one by one to get to the result.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  10. Rehabilitation Plan Analysis Result Parameter

    To better manage our assets from structural and maintenance perspective, our organization created two decision trees and set up two different rehab plans. As a user, I want to add the draft rehab plan layer as part of the Analysis Result parameter and user can select different draft rehab plan layer instead of the default output layer only.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  11. CCTV Wizard output

    The CCTV wizard Geocode Pipe Survey Data function is great. As a user, I want the output pipe length of connection layer to be 10 feet or less instead of 15 feet, because we have mainlines are close and parallel to each other, currently the connection lines crossed two different mainlines and very confusing.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  12. CCTV Wizard warning default value

    The CCTV wizard is one of my favorite tools in InfoAsset Planner, but it's very time consuming to run it manually. As a user, I would like to set the Give a warning when defect distance exceeds total length 1 feet as default value instead of 5 feet, so I can have it rerun silently.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  13. Detailed Risk Report

    We would like the ability to export a PDF report for a selection of pipe segments to include a map of each segment and all of the CoF and LoF detailed scores and values (i.e. the distance from water bodies and its CoF score).

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Admin →
  14. CoF and LoF Score Bubble Scale

    Our maximum score for both CoF and LoF is only a 5, but the CoF and LoF bubbles in the Facility Explorer appear to be default set at 10. At a glance, it is very confusing to most people who aren't engrossed in the model. We would like the ability to set the max score for these bubbles to be a 5 so that they are graphically shown properly.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  15. Capability to View Manhole Panoramic Scans

    Many of our client's manholes were surveyed with panoramic scans, so there are no still images that we can link to within InfoAsset Planner to view the inspection. We would like to ability to view manhole panoramic scans. The file format of these scans consist of "Storm and Sanitary Analysis Data Files," an IPF file, an IPS file, and subfolders of many still images from the pano scan.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Condition  ·  Admin →
  16. Set Up and Run a Multi-Parameter on Top of a Multi-Parameter

    We would like the ability to set up and run a multi-parameter on top of another multi-parameter. This will eliminate a LOT of outside Excel and GIS work and allow us to calculate these particular CoFs and LoFs all within InfoAsset Planner.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  17. As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

    The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP model reports the survival probability from the last break but not the time to the next break.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Failure  ·  Admin →
  18. Project Prioritization: Include multiple asset types in a single project

    Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. Basically Project Prioritization across asset types.

    Suggested by CDM Smith and others....

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  19. Add Additional Review Fields to Project Prioritization

    Project Prioritization is great step forward! However in future releases it'd be great to incorporate it further into an organization's CIP workflow. Specifically additional fields to specify whether a project has been reviewed, completed, in progress, etc.

    It'd also be useful to be able to be able to configure the naming of projects in IAP. Something different than just 1, 2, 3, 4, etc.

    Suggested by CDM Smith

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  20. direct import of MicroDrainage mdx files into InfoAsset Manager

    would like the ability to import MicroDrainage (MDX) files in to InfoAsset Manager, as per ICM, so asbuit developer proposals may be incorporated into collection networks to enable scheduling for survey/checks.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

Feedback and Knowledge Base