Skip to content

Asset Management

Welcome to the Innovyze Asset Management feedback page.

This forum is now locked as we transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

66 results found

  1. InfoAsset Planner - COF/LOF Wizard Pipe Inventory Table Join on Column other than FacilityID

    During "Step 3 - Set Parameter (Pipe Inventory)" I would like to be able to join the Internal/External table using an InfoAsset Planner column other than the "FacilityID". For example it would be great to also have the option of using the "LegacyID" to join the data however the COF/LOF is hard-coded to only accept the "FacilityID".

    It would be even better if any column could be used but that's probably not practicable given processing overhead and possible lack of data structure rules causing join errors. A handful of User Defined, ID columns would be great. These columns could then…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  2. InfoAsset Planner - Validate Existence of CCTV Video Files

    I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys.

    I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since the video name in the .xml file does not match the saved video. A way to select CCTV surveys referencing invalid CCTV video files would be very helpful.

    This might be something that needs to be pre-processed on the InfoAsset Manager side of things but would be nice if InfoAsset Planner users could run the…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. InfoAsset Planner - User Defined Scoring Range "Breaker" values in COF/LOF

    When selecting unique values in "Step 5 - Set Score Range" from within the COF/LOF wizard, it is not possible to add additional, user defined rows.

    I have a COF that scores a value from a table listing a severity as "Very Low", "Low", "Medium", "High" and "Very High" (scores = 1, 2, 3, 4 and 5), however, the data table does not have a row with "Low" as a rating. When the table is updated to include a row with a severity rating of "Low" the COF will not produce an accurate output since the value did not exist…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  4. InfoAsset Planner - Allow Renaming of Data Miners

    Allow Data Miners to be renamed in Data Miner.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  5. user defined boolean fields

    Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  6. InfoAsset Planner - Create Sub Groups in Operation Center

    Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple, distinct steps.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  7. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Reporting  ·  Admin →
  8. InfoAsset Planner - Allow Re-Ordering of Items in Operation Center

    Allow items in the Operation Center to be reordered; COFs, LOFs, Risks, Data Miners, etc.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Admin →
  9. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Admin →
  10. Update fields by SQL that reference files other than loaded GIS tables ie CSV

    Be able to update fields with data from external tables that don't reference primary InfoAsset fields ie Asset_ID, ID. Current SQL updates relly on input data being geocoded and user applying a spatial proximity.

    eg updating usertext1 with vaule from csv file where match is to a value in another user text field.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  SQL  ·  Admin →
  11. As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

    option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Network Tracing  ·  Admin →
  12. As an organization, we would like the ability to choose an alternative final risk calculation method.

    So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model.

    It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  1 comment  ·  Criticality  ·  Admin →
  13. Info Asset Mobile Field

    When conducting a CCTV survey in Info Asset Field our crews add the related xml, video footage and photos which provide the results of the survey.

    In the capture form there is no option to add multiple files at once. Our CCTV crews are having to add one file at a time and having to navigate folders in order to find the required document as there is no 'drag and drop' option either.

    Crews can survey 32 to 50 lengths per survey in some instances which makes adding multiple files very time consuming, adding to the operational team admin time…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Asset Condition  ·  Admin →
  14. Info Asset Mobile Field

    When our CCTV crews are using Info Asset Mobile Field for a CCTV survey capture, they are often surveying multiple lengths (recent example 32 runs).

    The teams are presented with a data capture form per length and each form has to be completed and closed for the survey data to be passed back to Info Asset Manager.

    This is very time consuming and adding a considerable amount of additional admin time into each survey.

    Please can you review the CCTV capture form and find a way that the entire job can be captured in one form that could relate to…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Asset Condition  ·  Admin →
  15. Display flow direction

    Display and visualize flow direction on map like InfoSewer/SWMM does based on GIS/inspection/tracing direction

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Network Tracing  ·  Admin →
  16. Autofill missing GIS assets based on PACP/MACP data

    When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as it has all of the necessary data to place these temporary assets. Having to get GIS just right (missing features, up/downstream manholes, etc.) to be able to import the inspection data can slow and if it fills in "dummy" assets based on the PACP/MACP data, you can quickly see where things are off between inspection data and GIS…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
  17. Update of underlying data model to be included as an option on the welcome screen

    Sitting in training with Orlando and Maggie and the question has been raised regarding the manual upgrade of the underlying data model. The statement that it is up to the user to update the data before commencing analysis but it is a manual task. A suggestion was that perhaps this update could be an option on the welcome/login screen

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
  18. View model results in InfoAsset Manager

    As a user I would like to be able to see hydraulic model results in InfoAsset Manager

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  19. Support for Prompt SQL queries in InfoAsset Online

    As a user I want to be able to run an SQL that prompts an InfoAsset Online user to enter a value such as a date range

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  1 comment  ·  SQL  ·  Admin →
  20. Incidents as polygons rather than just points

    As a user I want to be able to represent incidents like pollution spills or flooding events as a polygon extent

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

Feedback and Knowledge Base