Asset Management
66 results found
-
Add C-Factor to hydrants
Add a C-Factor and hydrant test object that allows one to associate residual hydrants and valves to be closed in addition to the flow hydrants.
1 vote -
As a company we use ios devices across the business
iOS version in relation to InfoAsset mobile, The Company utilises ios devices in the field and therfore require a ios version if the software is to be utilised.
1 vote -
I would like to schedule multiple work-orders within the InfoAsset Mobile Map.
It would be beneficial to be able to schedule multiple work-orders within the InfoAsset Mobile Map.
1 vote -
I want a separate manhole clean tab.
I would like to have a manhole clean/maintenance tab similar to the pipe clean tab. Manholes are a separate asset which deserve a system for tracking needed maintenance not related to repairs.
1 vote -
Import Inspection Data with .accdb Databases
It appears that InfoAsset Planner can only import inspection databases with a .mdb extension. Since the .accdb extension is the newer Microsoft Access format (since around 2003), can InfoAsset Planner include the capability to read .accdb inspection databases?
1 vote -
As a user, I want to be able to add fields to an analysis report and have the wizard automatically populate the new field when run
For example, one of the reports available for the Survey Data Analysis Wizard is for PACP scores. I want to add a field for the total number of defects associated with each segment and have it automatically populated when I run the CCTV Survey Analysis Wizard.
1 vote -
As an organisation we want InfoAsset Manager to be able to show dimensions relative to fixed points
In plans underground assets are often positioned using dimensions relative to a fixed point (pe corner of a house). InfoAsset Manager should be able to create dimensions like that.
1 vote -
InfoAsset Planner - View Multiple CCTV Videos Concurrently in Facility Assessment Tool
I have had a request from the Asset Condition and Reliability team to be able to view CCTV survey videos side-by-side when a pipe has multiple CCTV surveys. In the same way that the longsection view shows concurrent surveys, being able to see concurrent CCTV survey videos would be very beneficial to visually assesses changes in asset condition over time.
Current;y, switching between CCTV videos is very time consuming when comparing multiple surveys as only one can be viewed. Being able to view CCTV videos side-by-side-by-side would make the Facility Assessment Tool much more effective.
1 vote -
Export to extended TAB format
Can extended Tab format be added so software compatible with x64 MapInfo and allowing export of Tab files greater than 2Gb
1 vote -
Automated exchange with CMMS System
I want to use InfoAsset Planner on a (near) daily basis for optimizing O&M. The API connection to CMMS systems like Lucity and Cityworks is good but it still requires manually importing the data and manually creating work orders to send out.
2 ways to improve this workflow:
Automate the import of data from CMMS system
Streamline the process to generate work orders from rehab plan1 vote -
Rehabilitation Plan Analysis Result Parameter
To better manage our assets from structural and maintenance perspective, our organization created two decision trees and set up two different rehab plans. As a user, I want to add the draft rehab plan layer as part of the Analysis Result parameter and user can select different draft rehab plan layer instead of the default output layer only.
1 vote -
CCTV Wizard warning default value
The CCTV wizard is one of my favorite tools in InfoAsset Planner, but it's very time consuming to run it manually. As a user, I would like to set the Give a warning when defect distance exceeds total length 1 feet as default value instead of 5 feet, so I can have it rerun silently.
1 vote -
Detailed Risk Report
We would like the ability to export a PDF report for a selection of pipe segments to include a map of each segment and all of the CoF and LoF detailed scores and values (i.e. the distance from water bodies and its CoF score).
1 vote -
Add Additional Review Fields to Project Prioritization
Project Prioritization is great step forward! However in future releases it'd be great to incorporate it further into an organization's CIP workflow. Specifically additional fields to specify whether a project has been reviewed, completed, in progress, etc.
It'd also be useful to be able to be able to configure the naming of projects in IAP. Something different than just 1, 2, 3, 4, etc.
Suggested by CDM Smith
1 vote -
InfoAsset Planner - User Defined Scoring Range "Breaker" values in COF/LOF
When selecting unique values in "Step 5 - Set Score Range" from within the COF/LOF wizard, it is not possible to add additional, user defined rows.
I have a COF that scores a value from a table listing a severity as "Very Low", "Low", "Medium", "High" and "Very High" (scores = 1, 2, 3, 4 and 5), however, the data table does not have a row with "Low" as a rating. When the table is updated to include a row with a severity rating of "Low" the COF will not produce an accurate output since the value did not exist…
1 vote -
Info Asset Mobile Field
When conducting a CCTV survey in Info Asset Field our crews add the related xml, video footage and photos which provide the results of the survey.
In the capture form there is no option to add multiple files at once. Our CCTV crews are having to add one file at a time and having to navigate folders in order to find the required document as there is no 'drag and drop' option either.
Crews can survey 32 to 50 lengths per survey in some instances which makes adding multiple files very time consuming, adding to the operational team admin time…
1 vote -
Info Asset Mobile Field
When our CCTV crews are using Info Asset Mobile Field for a CCTV survey capture, they are often surveying multiple lengths (recent example 32 runs).
The teams are presented with a data capture form per length and each form has to be completed and closed for the survey data to be passed back to Info Asset Manager.
This is very time consuming and adding a considerable amount of additional admin time into each survey.
Please can you review the CCTV capture form and find a way that the entire job can be captured in one form that could relate to…
1 vote -
Incidents as polygons rather than just points
As a user I want to be able to represent incidents like pollution spills or flooding events as a polygon extent
1 vote -
User Defined Asset Creation
As a user I would like to be able to be able to create user defined assets from an imported XML file
1 vote -
Increase the amount of COF/LOF scoring options
Creating a COF/LOF, you are limited to 11 scoring options (1-10 and blank). It would be useful to have more scoring options.
E.g. if you have more than 10 unique values, let's say pipe materials, you have to compromise and give some unique values the same score.0 votes