Storm Sewer & Flood Modeling
Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.
314 results found
-
Merge more than two polygon in one go
Merging polygons representing for instance mesh zones can help reducing the number of triangles, particularly small ones, and reduce simulation time. The version of ICM I am using can only merge two polygons at the time. I currently do the polygon merge as part of my data pre-processing before importing the data into ICM as I can merge more than two polygons at the time. However, it would be useful to be able merge several polygons in one go in ICM.
5 votes -
Realign feature
A new feature I’d like to see for lines/polygons is a ‘realign feature’ tool. When selected, if you clicked on a vertex in a line or on a polygon boundary (single click and release), it would ‘grab’ that vertex and allow you to move it. Once you placed it, when you move the mouse either direction along the line, it would AUTOMATICALLY grab the next vertex on the line. Right-clicking would bring up a menu allowing you to ‘release’ the line (leaving the ‘grabbed’ vertex in its original location), delete the grabbed vertex, insert a new vertex, or ‘skip’ a…
2 votes -
Realign Feature Tool
For XPSWMM and Infoworks (any GUI editor you have actually):
Moving an existing line substantially is something that occasionally happens. If we could do this without having to delete the entire thing, or click and drag each vertex one at a time, it would be a big help at times.
A new feature I’d like to see for lines/polygons is a ‘realign feature’ tool. When selected, if you clicked on a vertex in a line or on a polygon boundary (single click and release), it would ‘grab’ that vertex and allow you to move it. Once you place it by…
1 vote -
Triangles browser
Small triangles can slow down 2D simulations significantly. Currently, after creating a 2D mesh, I export the 2D mesh to a GIS software to check how many triangles I have below certain size and where they are. This helps me address the problem of small triangles efficiently. it would be helpful to have a similar functionality in ICM (i.e. triangles browser).
17 votes -
As a user, I would like to have warnings about the landuse polygon size that will greatly slow down the performance in XPSWMM.
Large number of land use polygons can greatly slow down the performance of XPSWMM, it can take up to 10 min to open and save a model. Ideally this issue should be fixed. Before that happens, if XPSWMM can warn the user for the large size of the landuse polygons, and provide links to ways to simplify the polygons or move landuse out as a reference layer, that will save the users lots of time.
1 vote -
Background tasks overall progress visible in ICM
I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a loading bar, which will show the overall progress of that task.
9 votes -
Import selection lists from CSV
A simple request - can we have the ability to create csv files of selection lists that could then be imported into ICM?
12 votes -
Include groundlevel as attribute in export network 2D mesh elements
When you export a model to shape for example, only the element id is included. You have to run a simulation (for a second) and then exporting maximum reveales the element ground level. It saves time to add the mesh element level to the export. Although easy to add in GIS, the element area is also a handy attribute
5 votes -
Wide "Oval" shape ID
conduit shape ID "Oval" only allows Height > With. So for "horizontally" wide oval conduits a new conduit shape has te be defined. It would be practical if the standard "Oval" also allows a with greater than the hight.
11 votes -
no flag update when updating via CSV
In ICM, when only updating a value via CSV file (Network -> Import -> Update from CSV files), the data flag should be left untouched instead of being "blanked" or updated with a new value (based on the "Flag to use for new/updated data" in the 'import from CSV data" screen)
2 votes -
Improved Method to export videos / graphics from ICM
This suggestion is from NYC DEP. We would like the ability to more easily export results from ICM in video or picture format.
2 votes -
Dissolve river reaches into multiple river reaches
It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite tool of the river reach merging tool). The two main applications for this are 1) If you need to connect a pipe to a river reach and you need to add a new node that will interpolate a new X-section somewhere and will cause the river reach polygon to be outdated, so you need to generate it again... it is…
6 votes -
Option to disable flag colour backgrounds for Custom Labels
When creating a custom label and using field values, the values have a background in the colour of the flag value. In many cases, the flag value is not a suitable colour to be a background and makes the text difficult to read.
Could you make an option in the Formatting settings for custom labels to disable this behaviour so that the flag colour is not displayed.17 votes -
Use edit flag for selection of fields only
By using the Use edit flag option, all changed fields are now set to the edit flag. For a lot of fields (for example the us and ds node or the suffix) it is not necessary to set this flag to the Edit flag.
4 votes -
Tile only for selected windows
Choose which Windows are used for Tile Horizontally or Tile Vertically. If a Geoplan and two Long Sections are open, we want to tile only the Long Sections, so a selection for the tiling would be useful.
5 votes -
2 votes
-
Circular sluices/penstocks would also be useful
Similar to the rectangular flap valve request, circular sluices would avoid workarounds trying to estimate the rectangular equivalent to a half closed circular penstock (or worse still a half closed egg shaped penstock)
19 votes -
RTC rule themes
It would be great if it was possible to theme in the GeoPlan on the basis of the rules which are active for a given object at the visible timestep.
27 votes -
Bridge section data updates
When a bridge section is changed then there are repeatable tasks for entering openings again, if this workflow could be improved that would be great.
8 votes -
Additional keyboard shortcuts
Keyboard shortcuts can really help speed up processes and workflows in InfoWorks ICM but some of the menu options do not yet have these. Would it be possible to add the missing keyboard shortcuts, specifically for repeatable tasks such as updating objects from ground models?
29 votes