Water Distribution
89 results found
-
Specify number of demands
I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
2 votes -
Improve model maintenance
As a user I want to be able automate my model build maintenance activity so that my hydraulic model always reflects the asset repository
4 votes -
2 votes
-
Automate concurrent Fireflow simulations
When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possible using the exsiting InfoWater platform.
2 votes -
IWLive Pro to adopt simulation periods of ICMLive
Each simulation has a hindcast period, now and a forecast period
2 votes -
Split pipes using the InfoWater "Digitize Network" tool
The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split when it actually has not.
1 vote -
For fire flow simulations, I would like to have range reports for pipes, valves, pumps, reservoirs, and tanks.
For example, I would like to know the maximum, minimum, and average velocity through each PRV across all fire flow runs in a simulation.
2 votes -
Report on model calibration
As a user I want to be able to easily assess model calibration based on comparison with telemetry
1 vote -
InfoAsset integration
As a user I want to be able to generate workorder based on my UDF flushing sequence/generate UDF flushing sequence out of work orders
1 vote