Skip to content

Water Distribution

This form is now locked to allow us to transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

89 results found

  1. Specify number of demands

    I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Productivity  ·  Admin →
  2. Improve model maintenance

    As a user I want to be able automate my model build maintenance activity so that my hydraulic model always reflects the asset repository

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  1 comment  ·  Automation  ·  Admin →
  3. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
  4. Automate concurrent Fireflow simulations

    When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possible using the exsiting InfoWater platform.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Automation  ·  Admin →
  5. IWLive Pro to adopt simulation periods of ICMLive

    Each simulation has a hindcast period, now and a forecast period

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. Split pipes using the InfoWater "Digitize Network" tool

    The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split when it actually has not.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
  7. For fire flow simulations, I would like to have range reports for pipes, valves, pumps, reservoirs, and tanks.

    For example, I would like to know the maximum, minimum, and average velocity through each PRV across all fire flow runs in a simulation.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. Report on model calibration

    As a user I want to be able to easily assess model calibration based on comparison with telemetry

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Telemetry  ·  Admin →
  9. InfoAsset integration

    As a user I want to be able to generate workorder based on my UDF flushing sequence/generate UDF flushing sequence out of work orders

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
1 2 3 5 Next →

Feedback and Knowledge Base