89 results found
-
A simple way to get an upstream or downstream trace analysis for all objects (node or pipe)
In WS Pro
Upstream/downstream tracing is easy for a single object.
Obtaining a single useful value (i.e. property count) is easy for multiple objects.Combining the two is very difficult at the moment in WS Pro
I want to be able to obtain, either for all objects or a selection, the value of data x upstream or downstream.
For example: length of mains upstream, no of properties downstream
This would be a really powerful risk assessment tool but also useful for quick operational analysis.
1 vote -
Edit Pump and Valve Curves in IWLive
IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modify them.
2 votes -
Be able to change the background colour
In InfoWorks the background colour for the GeoPlan is white - it would be beneficial to change this colour to the users choice to make particular features stand-out more clearly in the GeoPlan view
5 votes -
Add new run groups and move existing runs to these
I’ve currently got one very big run group which should’ve really been split into several different ones.
Is there a way to move around runs? In the explorer there’s only really the option to duplicate.4 votes -
Boundary trace toolbar shortcut
I often use the boundary trace tool to understand the extent of a DMA/PMA. Currently, we have to go to Geoplan -> Tracing Tools -> Boundary Trace, and it would be a lot easier if it was available as a toolbar shortcut.
3 votes -
water age - representing re-chlorination station by resetting age to 0 hrs
Depending on the size of the distribution/reticulation system water is often chlorination at the WTP and re-chlorinated at various locations within the network.
There is no way to reset the water age value at a reservoir or node etc. to represent a re-chlorination station. This makes it difficult to get an idea of the age of water in the reticulation since passing the last re-chlorination station.
Can this feature be added to the model?
5 votes -
Time varying initial water age profile
As a user it would be great to be able to add a time varying initial water age profile for transfer nodes. This would allow us to assess water age within the distribution network without having to combine models.
13 votes -
Head Units
In WS Pro it would be useful to be able to set the units for head in m AD. This used to be an option in WS. It can be confusing for people starting in or not familiar with modelling to differentiate between pressure and head and having this option would really help.
6 votes -
Node Name Generation Default
In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network
5 votesThe functionality is already provided with the Digitisation Template in WS Pro. Please confirm what enhancement are you suggesting. Thanks
-
Smart meters
Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution network models?
6 votes -
Support variable speed in live data
Variable speed is now an unsupported attribute in live data.
5 votes -
Extend flexibility in displaying information associated to HGL profiles
As an InfoWater user I'd like to be able to add more information to my HGL profile, including nodal pressure, pipe diameter, flow, velocity, etc. I'd like see max/min level achieved throughout the simulation and have the ability to quickly add pipes to profile
6 votes -
Set Area Codes- InfoWorks WS Pro
Add an "Exclude Selection List" option to the "set Area Codes" tool in IW WS Pro so that you can exclude selected links from the area code trace.
6 votes -
Improvements to custom DB table fields
- Ability to modify the length of custom fields in the DB tables after they have been created. This is particularly a problem when you create a text field, but realize later it is too short. Another option would be to make the default text length 250 characters rather than 20.
- Better manager for custom fields. The user should be able to create a field once and choose which information DB tables to add it to. See example at link. https://ibb.co/CbFKnn2
5 votes -
Specify number of demands
I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
2 votes -
2 votes
-
Split pipes using the InfoWater "Digitize Network" tool
The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split when it actually has not.
1 vote -
Add ability to rename datasets, patterns, queries, etc
- Allow the "Change ID" tool to rename datasets, patterns, queries, etc.
- Make the "Change ID" window wider or resizeable to fit longer IDs.
10 votesPartially completed: “Change ID” window is now resizable. Functionality available from InfoWater Pro 3.5 Update 2. Target release data April 2021
-
Automate concurrent Fireflow simulations
When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possible using the exsiting InfoWater platform.
2 votes -
IWLive Pro to adopt simulation periods of ICMLive
Each simulation has a hindcast period, now and a forecast period
2 votes