Skip to content

Storm Sewer & Flood Modeling

Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.

This forum is now locked as we transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

370 results found

  1. Show individual vertex points in the geoplan at all zooms

    Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Admin →
  2. I would like improvements for ICM with SWMM engine

    add ICM SWMM functionalities that are already available in ICM with regular engine
    - Area take off
    - Population data
    - CN/Runoff coeff. lookup
    -Create dummy boundaries

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  5 comments  ·  Productivity  ·  Admin →
  3. Simulation engine control update

    Since the beginning of ICM and allowing to send simulation to other computers in the network, there was a need for knowing exactly who is currently sending simulations and to which computer. Please update the ICM with this improved functionality for the normal user, not for admin only. These people are the ones who send simulation to the network, not IT people!

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    4 comments  ·  Hydraulics  ·  Admin →
    IN DISCUSSION  ·  pascal.lang responded

    Thank you for the addition of this request, we are in discussions about how this might be achieved as the level of awareness of tasks is varied between agents. Would a dashboard showing who sent which simulation where (which are still ongoing) be sufficient? This would be without the progress those simulations have already made available as a first step.

  4. Zoom graphs on either axis

    Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible to change the y-axis range in properties, but that is not desired since it requires changing the range numerous times as you pan through the data. This is a major caveat which sometimes changes our choice of modeling software, especially for systems which require heavy calibration and data visualization.

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Visualization  ·  Admin →
  5. I would like to be-able to reorder scenarios in the drop down in ICM

    II would like to be able to change order of scenarios (after Base). So be able to move up scenarios or down scenarios in the drop down list. I often have to delete scenarios or created amended versions of copied scenarios and this often results in a pretty messed up list of scenarios

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Other  ·  Admin →
  6. Time varying roughness values for rivers

    As vegetation changes throughout the seasons, it would be great if we could also have time varying roughness patterns for river reaches.

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Admin →
  7. Customization of Grid Windows in InfoWorks ICM

    Allow custom grid window layouts in InfoWorks ICM, much like the Property window. Allow the user to reorganize the columns, change the column widths, or hide unnecessary columns, and save it as a layout to be applied as a default.

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  8 comments  ·  Other  ·  Admin →
  8. Conveyance on cross section lines

    Provide cross section conveyance for each cross section

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Hydraulics  ·  Admin →
  9. Bank line ground model update from within properties view

    Make update from ground model possible from within properties view (as is already possible for cross sections)

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Admin →
  10. Know which master database refers to a working/results folder

    Create a means to know which master database is connected to a working / results folder. i.e. to go from the long name of the working / results folder to the ICM master database. A simple text file within the folder could give the name of the master database and version of ICM,

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  1 comment  ·  Productivity  ·  Admin →
  11. Incorporate ARR2019 Initial Loss & Continuing Loss (IL/CL) infilitration type for 2D Infiltration surfaces

    ICM currently allows 4 infiltration types in 2D infiltration types:

    -fixed
    -Horton
    -Constinf
    -GreenAmpt

    Australian Rainfall and Runoff 2019 talks default initial loss and continuing loss parameters for rural catchments, values for which which can be found in the BOM data hub.

    A new 2D infiltration type which allows the simple IL/CL would allow 2D modelling more inline with ARR2019.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Hydrology  ·  Admin →
  12. Cross section result view: keyboard shortcuts to go upstream or downstream

    In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
  13. Give a warning when copying between networks with different user defined defaults

    when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
  14. Commit history for scenarios

    Commit history for scenarios
    Show an extra column in the commit history window to indicate how many scenarios exist in this version of the network. Ideally, there would be a button or column through which you can see the names of the scenarios for this network version.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
  15. blockage

    Applying pipe blockage is a standard required in Australia and the functionality in ICM to do this is not user friendly (using blockage links). A simple % pipe blockage in the conduit properties should really be an option. This is particular the case for cross drainage and also orifice and pipes leaving detention basins (where a pit isnt used)

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Hydraulics  ·  Admin →
  16. Pruning does not sub reassign drainage links correctly

    When pruning, subcatchment drainage manholes are reassigned to the first modeled downstream manhole. However, when pruning subcatchments that drain to single or multiple links, ICM gives incorrect results in some cases and doesn't work at all in other cases, which then causes validation errors after pruning. I submitted this as a bug since it gives incorrect results, but Innovyze asked me to submit is as a "feature request". So please vote for this so it can be fixed and work correctly.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Admin →
  17. Sub catchment Ground Slope

    Currently ICM isn't equipped with the tools to calculate the slope from an underlying ground model or 2D zone so this will need to be determined outside of the program. Can you include the ability for the program to calculate an average catchment slope based on the 2D mesh data or ground model within each sub catchment as an option if this has not been done outside of ICM?

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydrology  ·  Admin →
  18. Import selection lists from CSV

    A simple request - can we have the ability to create csv files of selection lists that could then be imported into ICM?

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
  19. Bank marker distinctions

    It would be good if cross sections for rivers could be marked with left and right bank markers within the cross sections themselves.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Admin →
  20. Export run results to csv: timestep options

    When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one your run uses, would be nice. These features could maybe be added to the replay options dialog?

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →

Feedback and Knowledge Base