Storm Sewer & Flood Modeling
Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.
370 results found
-
'Find and Replace Flags' tool on multiple networks.
As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more flags get added, which are now obsolete in our current specification leading to hundreds of flags in the masterdatabase. It is not practicable to use the find and replace flags tool on each network individually, if this feature was expanded to be able to use on multiple networks, it would make administering our model flags much…
21 votes -
AutoCAD DWG Background
As a user, I would like to have AutoCAD drawing files as a part of my map control (InfraWorks ICM background) so I can see my AutoCAD Civil 3D design.
21 votes -
2D worst case analysis
I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
20 votesThank you for this idea addition, it is something we have been considering and building out plans for, if there are more specifics in terms of the exact outputs/comparisons you would like to see, please feel free to add so we can ensure these are captured.
-
Improve ground infiltration simulation parameters.
Could we have a 'Node level affects groundwater infiltration' for the soil store please?
This simulation parameter was introduced to InfoWorks ICM recently to limit infiltration from the ground store to the model. Could this be extended to limit flows from the soil store as well?
As often when are using models for design purposes, infiltration can become excessive in design events compared to verification. Therefore we have to manually reduce soil store inflow, often requiring new limiting discharge orifices and nodes at each subcatchment with GI applied. Thanks19 votes -
Model results as TVD connectors
We'd like to have model results as an input in the TVD connectors. An example is where we have observed flows that we would like to use at a tributary and then switch to catchment flows when the observations run out. We know this can be done using a set up of sluices and dummy objects but it would be a lot more elegant to simply have the subcatchment as Input B. I'm sure there are plenty of other examples of where using model results as an input would be useful.
19 votes -
19 votes
-
Circular sluices/penstocks would also be useful
Similar to the rectangular flap valve request, circular sluices would avoid workarounds trying to estimate the rectangular equivalent to a half closed circular penstock (or worse still a half closed egg shaped penstock)
19 votes -
Enable Data Flags for bed levels and roughness values in river section data
Enable data flagging for the bed level and roughness values within the river cross section data. This information was available in RS and is sorely missed.
19 votes -
Flow Survey importer
It would be good to update the flow survey object and importer, giving this a more updated feel and removing some of the steps.
19 votes -
Use tracers for water on mesh elements
Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. from existing objects like infiltration zones or roughness zones) we think we'll be able to better help our clients.
18 votes -
Create channel section lines from points
Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
17 votes -
Ability to use variables in range RTC rules
For RTC range rules, we want to be able to use variables instead of constant values for the minimum and maximum values.
17 votes -
Calculating volume storage on river reaches
In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If the number of river sections is very large in the model,it will take a lot of time and effort to accomplish this work. It would be great to have the tool to calculate volume storage on river reaches automatically.
17 votes -
Speed up the creation/amending of ICMTs
Creating or amending ICMTs is slow, especially if they contain ground models. Even deleting or creating new 'folder' items in ICMTs is slow. Speeding this process up would increase productivity.
17 votes -
Triangles browser
Small triangles can slow down 2D simulations significantly. Currently, after creating a 2D mesh, I export the 2D mesh to a GIS software to check how many triangles I have below certain size and where they are. This helps me address the problem of small triangles efficiently. it would be helpful to have a similar functionality in ICM (i.e. triangles browser).
17 votes -
Option to disable flag colour backgrounds for Custom Labels
When creating a custom label and using field values, the values have a background in the colour of the flag value. In many cases, the flag value is not a suitable colour to be a background and makes the text difficult to read.
Could you make an option in the Formatting settings for custom labels to disable this behaviour so that the flag colour is not displayed.17 votes -
Management of Siltation module within ICM Live
As part of our ICM Live system we use the Siltation module. While this creates a dynamic siltation on each pipe, there isn't an easy way to manage it. Once a pipe is cleaned we need to stop the live model and potentially apply all the dynamic silt levels to the conduits as if they were observed and restart the siltation module form scratch. We need a better way. Could we have a job created for PPM (as in InfoAsset) that would reset the dynamic value on specific pipes. This could be linked to InfoAsset?
16 votes -
bottom opening
Beside an upstanding vertical orrifice, it would be practical to be able to implement horizontal 'bottom holes' from one node to an underlaying node. e.g when a ditch can drain to an underlying conduit by means of a bottom opening. This might be a more straight forward implementation then the weir circumference workround method which is now often used. if possible both circular and rectangular.
16 votes -
Automated Calibration Tool
Tool similar to competing software where you can apply a level (%) of uncertainty and automatically sun simulations with varied parameters withing that level of uncertainty and see all results at once.
16 votes -
River bank cumulative flow
It would be great to have the ability to graph bank flows and have a cumulative flow result available.
16 votes