Skip to content

Storm Sewer & Flood Modeling

Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.

This forum is now locked as we transition to https://innovyzefeedback.autodesk.com
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

370 results found

  1. Support for multiple screens

    Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.

    84 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  2. Validation as a background task

    Validation as a background task so UI isn't locked.

    37 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Admin →
    IN DISCUSSION  ·  pascal.lang responded

    We have spent quite a bit of time investigating how validation improvements might be achieved, whether that be through validation as a background task or whether it be with improvements on the speed of validation in the first place.

    There is no silver bullet which has been identified so far, the validation is already very efficient with minimal potential for speed improvements and there are issues with it as a background task as previously mentioned which we haven’t got fully fledged solutions to yet.

  3. Partially complete a simulation and review results and then opt to continue the simulation

    Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to completion.

    34 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  pascal.lang responded

    The approach which we are looking to leverage here is one which deviates a little from the original request but gives the same ability to interrogate results part way through a simulation. After investigating options, the best appears to be to have a run for the total duration you are interested in, then set a state saving checkbox in the run and when you wish to interrogate simulation results stop the simulation. We will then make use of ICMLive developed concatenation of results to allow us to tie in the “continuation run” with the results which were stopped earlier. There is a lot more detail to this than I can add here, but it should meet the need.

  4. 29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Additional keyboard shortcuts

    Keyboard shortcuts can really help speed up processes and workflows in InfoWorks ICM but some of the menu options do not yet have these. Would it be possible to add the missing keyboard shortcuts, specifically for repeatable tasks such as updating objects from ground models?

    29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  4 comments  ·  Productivity  ·  Admin →
  6. 28 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
  7. Set up runs more efficiently

    Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed.

    Model Name
    Base Model

    Rainfall Inflow WWG Tradeflows
    M5-30 Inf-M5-30 WWG1 Trade1
    M5-240 Inf-M5-240 WWG1 Trade1
    M5-960 Inf-M5-960 WWG1 Trade1
    M10-30 Inf-M10-30 WWG1 Trade1
    M10-240 Inf-M10-240 WWG1 Trade1
    M10-960Inf-M10-960 WWG1 Trade1

    With same timesteps and 2D parameters?

    28 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. RTC rule themes

    It would be great if it was possible to theme in the GeoPlan on the basis of the rules which are active for a given object at the visible timestep.

    27 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Visualization  ·  Admin →
  9. Save toolbar and screen configurations and locations

    I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens.

    For example, on my external monitor there is enough room to have the User Actions toolbar displaying, but my laptop is smaller and there is no longer enough room for it, so instead of two rows it bumps down to three and moves my toolbars all around. Adding in profiles or even a scrollable space for the toolbars so the ones to the…

    27 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Productivity  ·  Admin →
  10. Remove Need to Validate When Changing Background Layers

    Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when I don’t recall changing anything.

    26 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. 26 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Admin →
  12. Adjust mesh locally without remeshing all

    Adjust mesh locally without having to remesh the entire 2D zone.

    26 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  2D Flooding  ·  Admin →
    ON ROADMAP  ·  pascal.lang responded

    We are looking into this, but for the majority of cases it might be that there is already a significant improvement related to this with the new “Clip meshing” which was released with version 11.0 of the software, but in a prototype state, please ensure outputs are reviewed before use. The reason it provides an improvement is that it does a coarse mesh first (which is likely to remain unchanged if only small amendments are made) and follows this with a more detailed mesh after. It would be great to get any feedback you might have on your experiences with the Clip meshing and consistency of results.

  13. Integrate a Template option for setting out run group in Infoworks ICM

    I am working on project which includes 50 models. where we have to give runs for different return periods and durations for each model. It is a time taking process, which unnecessarily create chances of error by creating run setup every time. is it possible to include a run set up template, which can be changed as per the user requirement and saved for the further use.?

    25 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  14. Support for more than two simulations in long sections

    When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.

    25 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Admin →
  15. Inverse Distance Weightage in ICM

    We have Thiessen in ICM. It will be great if we have IDW like what we have in RS.

    25 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Rainfall  ·  Admin →
  16. As a user I want to be able to adjust dry weather flow diurnal profiles easily to account for day light savings

    Diurnal wastewater and tradewaste profiles shift over the course of the year due to day light saving time adjustments. I would like to see ICM include the ability to phase shift the diurnal patterns to account for DLS. I believe this adjustment would be best placed in the "monthly calibration" tab where in addition to the scaling "factor' there is also a time adjustment factor

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Calibration  ·  Admin →
  17. Use ruby to edit rainfall dialogue box

    Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
  18. RDII Analyst (in ICM)

    Provide RDII Analyst without needing to purchase InfoSWMM

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Hydraulics  ·  Admin →
  19. Improve database and results files read performance

    When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be limited to a disk "queue depth" of 1 and is therefore very sensitive to drive latency. In a cloud environment, drive latency can be in single digit milliseconds. Therefore, the read process might achieve 400 x 4 kB = 1.6 MB per second. If the database file is large, it can take many minutes for the…

    23 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  20. Statistic Report Batch Processing

    As a use the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and prevents any other operation from been undertaken. This is highly inefficient and costly especially when optioneering if several iterations are needed. Shorter TSR's can be run in this case however even a year with several CSO's can take 20-30mins.

    23 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  4 comments  ·  Reporting  ·  Admin →
← Previous 1 3 4 5 18 19

Feedback and Knowledge Base